
Kitchen and living room
Wall removed, new kitchen island, underfloor heating.
Concept demo — made by HatalyXConcept demo A fictional business, not a real company.
Renovation and construction · fixed price
Kitchens, bathrooms, full renovations and new homes. A free site survey, an itemised quote, and a contract that fixes both the price and the deadline.

01 Services
Strip-out to handover: electrics, plumbing, walls, floors and finishes
Waterproofing, tiling, walk-in shower, underfloor heating
Layout, electrics and plumbing, fitting the furniture
Re-roofing, insulation, gutters and skylights
Insulation, render and new window sills
Foundations, walls, floor slab and roof structure
Prices include labour and basic materials. The itemised quote after the survey is binding.
02 Projects



Wall removed, new kitchen island, underfloor heating.

Two bedrooms and a shower room under the roof, with skylights.

15 cm insulation, new render and window sills.
03 Cost estimate
Three questions, an instant range. The binding price comes from the itemised quote after the free survey.
Estimated cost
€38,000–45,600Estimated time
10–14 weeksLabour and materials included.
Request an exact quote04 Process
We measure, check the walls and the wiring, and listen to what you want.
Every item with quantity and unit price, within 5 working days.
Fixed price and deadline in writing, with payments tied to stages.
One site manager as your contact and a photo report every Friday.
We clean up, walk through everything with you and hand over the warranty papers.
05 Request a quote
We reply in writing within one working day and suggest a date for the free survey.
Free survey · No obligation · Reply within one working day
Yes. The contract price only changes if you ask for extra work, and every change is a written, priced addendum before we start it.
For renovations without a permit we do everything. Where a permit is needed, we work with a partner architect and include it in the quote.
For a bathroom or a kitchen, usually yes. For a full renovation we recommend moving out; we plan the stages to keep that as short as possible.
In stages tied to finished work: a deposit at signing, then after each completed stage. Never everything in advance.